kanban-live-gantt
PLUGINLive, now-centered Gantt timeline for the Ulpi kanban boards — a slidable, persisted 72 h window (default now -24h -> now +48h; drag to move, drag the ends to resize).
by ningfangbin · v0.1.3
What it does
Live, now-centered Gantt timeline for the Ulpi kanban boards — a slidable, persisted 72 h window (default now -24h -> now +48h; drag to move, drag the ends to resize), free wheel zoom down to hour ticks, a now line, status filtering, an optional done lane, and lifecycle rendering (dashed waiting vs solid run spans at real durations). Fork of kanban-gantt (GPL-3.0).
Disclosure — the backend can transition, reassign, comment on and permanently delete kanban tasks on any board (Desktop asks for confirmation before deletes); local SQLite only, no network.
Review notes
What an owner reads and accepts before the install is approved.
- licence AGPL-3.0 (plugin/LICENSE) is not permissive